The City of Inver Grove Heights is studying roadway improvements for the 65th Street Improvement Project between Robert Trl (Hwy 3) and Babcock Trl. 
Feasibility Report
A feasibility report was prepared and available to review. The purpose of this study was to further evaluate the feasibility of the infrastructure needs of the Northwest Expansion Area from a transportation perspective. A Community Collector street system was evaluated that promotes east-west connectivity between existing Robert Trail South and Babcock Trail along the future 65th Street alignment.
Tentative Study Timeline:
- Order Feasibility Report: September 2017
- Public Comment Period for Feasibility Report: December 2020
- Draft Feasibility Report to City Council: Feb/March 2021
- Present Feasibility Report to Planning Commission: March/April 2021
- Accept Feasibility Report/Set Public Hearing: March/April 2021
- Public Hearing: April/May 2021
Stay Connected
Email Notifications
Sign up for the "Notify Me" subscriber list for this project to receive updates on project progress and scheduling: www.ighmn.gov/list.aspx.
Project FAQs
Questions
If you have questions or concerns regarding the work being performed please feel free to contact City Engineer, Tom Kaldunski, at 651-450-2572 or tkalduski@ighmn.gov. Or Brad Reifsteck, project consultant with WSB at 715-512-5243 or BReifsteck@wsbeng.com.