Future 65th Street Study

Sign Up for Project Updates Online

The City of Inver Grove Heights is studying roadway improvements for the 65th Street Improvement Project between Robert Trl (Hwy 3) and Babcock Trl. 2016-19 Future 65th Street Study Area Map Opens in new window

Feasibility Report

A feasibility report was prepared and available to review. The purpose of this study was to further evaluate the feasibility of the infrastructure needs of the Northwest Expansion Area from a transportation perspective. A Community Collector street system was evaluated that promotes east-west connectivity between existing Robert Trail South and Babcock Trail along the future 65th Street alignment.

Tentative Study Timeline:

  • Order Feasibility Report: September 2017 
  • Public Comment Period for Feasibility Report: December 2020
  • Draft Feasibility Report to City Council: Feb/March 2021
  • Present Feasibility Report to Planning Commission: March/April 2021
  • Accept Feasibility Report/Set Public Hearing: March/April 2021
  • Public Hearing: April/May 2021

Stay Connected

Email Notifications

Sign up for the "Notify Me" subscriber list for this project to receive updates on project progress and scheduling: www.ighmn.gov/list.aspx.

Project FAQs

Questions

If you have questions or concerns regarding the work being performed please feel free to contact City Engineer, Tom Kaldunski, at 651-450-2572 or tkalduski@ighmn.gov. Or Brad Reifsteck, project consultant with WSB at 715-512-5243 or BReifsteck@wsbeng.com