Construction Update: 50th Street Area (Babcock to TH 3)

Formatted HTML message

2025 IGH Pavement Management Initiative - 50th Street Area St (Babcock to TH 3)

Construction Updates

This Week (05/19-05/23):  

Crews will be backfilling soil behind the new curb.

Next Week (05/26-05/30):  

No work is planned on 50th St East or Ashley Lane this week.

General Updates

Access:  `

The contractor will perform work while maintaining traffic flow. However, temporary road closures may occur during utility work. Access will be restored at the end of each workday. For information regarding private driveway access, please refer to the Curb and Driveway Notice below.

Garbage Service:

As construction activities continue in your area, please be advised that garbage collection services will not be impacted. Residents should continue to place their garbage and recycling bins out on their regular collection days and in their usual locations.

Curb and Driveway Notice:

The contractor will provide written notice to any homeowner whose driveway access will be temporarily impacted. If you receive a notice and need to use your vehicle during the day, you must park in the designated area indicated in the notice. Once the initial work is completed, gravel will be placed in front of affected driveways to provide temporary access until permanent repairs are made. Driveway access will be restricted again when the curb is poured and driveways are repaired. A separate advance notice will be provided before this occurs.

Right-of-Way Obstruction Notice:

Property owners are responsible for any irrigation systems, invisible dog fences, or other unpermitted obstructions located within the public right-of-way (approximately 12–15 feet behind the curb, within the boulevard area). To avoid potential damage or additional costs during construction. Please temporarily relocate your irrigation lines at least 4 feet behind the curb before work begins in your area. After topsoil is placed, you may reinstall their irrigation systems prior to sod installation. Neither the City nor the Contractor is liable for damage to any unpermitted obstructions within the right-of-way. Please turn off any irrigation zones that are near the street until work is completed.

City Contact:

Please contact David Ray, Asst. City Engineer by email or call 651-450-2541.

More info at: www.ighmn.gov/pavement

* * * * * * *

If you no longer wish to receive these messages, you may manage your preferences and unsubscribe at any time by visiting: www.ighmn.gov/list.asp?mode=del.

Please note, we will not sell or give your email address to any organization without your explicit permission.

 

Plain text message

2025 IGH Pavement Management Initiative - 50th Street Area St (Babcock to TH 3)

Construction Updates

This Week (05/19-05/23):
Crews will be backfilling soil behind the new curb.

Next Week (05/26-05/30):
No work is planned on 50th St East or Ashley Lane this week.

General Updates

Access:
The contractor will perform work while maintaining traffic flow. However, temporary road closures may occur during utility work. Access will be restored at the end of each workday. For information regarding private driveway access, please refer to the Curb and Driveway Notice below.

Garbage Service:
As construction activities continue in your area, please be advised that garbage collection services will not be impacted. Residents should continue to place their garbage and recycling bins out on their regular collection days and in their usual locations.

Curb and Driveway Notice:
The contractor will provide written notice to any homeowner whose driveway access will be temporarily impacted. If you receive a notice and need to use your vehicle during the day, you must park in the designated area indicated in the notice. Once the initial work is completed, gravel will be placed in front of affected driveways to provide temporary access until permanent repairs are made. Driveway access will be restricted again when the curb is poured and driveways are repaired. A separate advance notice will be provided before this occurs.

Right-of-Way Obstruction Notice:
Property owners are responsible for any irrigation systems, invisible dog fences, or other unpermitted obstructions located within the public right-of-way (approximately 12&15 feet behind the curb, within the boulevard area). To avoid potential damage or additional costs during construction. Please temporarily relocate your irrigation lines at least 4 feet behind the curb before work begins in your area. After topsoil is placed, you may reinstall their irrigation systems prior to sod installation. Neither the City nor the Contractor is liable for damage to any unpermitted obstructions within the right-of-way. Please turn off any irrigation zones that are near the street until work is completed.

City Contact:
Please contact David Ray, Asst. City Engineer by email [dray@ighmn.gov] or call 651-450-2541.
More info at: www.ighmn.gov/pavement
* * * * * * *
If you no longer wish to receive these messages, you may manage your preferences and unsubscribe at any time by visiting: www.ighmn.gov/list.asp?mode=del [https://www.ighmn.gov/list.asp?mode=del] .
Please note, we will not sell or give your email address to any organization without your explicit permission.

SMS message

PMI Update: Some minor dirt work this week and no work is planned in this project area next week. More info at ighmn.gov/pavement